Union pacific pipeline crossing specifications THIS AGREEMENT(“Agreement”) is made and entered into as of April 03, 2019, (“Effective Union Pacific is the largest railroad in North America, covering 23 states across the western two-thirds of the United States Union Pacific Engineering Project Specifications. Overhead Wireline Crossing 750 Volts or Less: Application Form Subject: Utility specification form to copy, complete and mail or fax Keywords: wire, wireling, utility, engineering, form, real estate Created Date: 7/9/1998 8:16:27 AM MINNESOTA UTILITY CROSSING APPLICATION 1. ; Permit To Be On Railroad Property for Utility Survey Form: Print a copy, complete and mail or fax. Mile Post: 8. Scope: All pipelines proposed for installation under UPRR right-of-way and trackage using HDD. sept. 1. Home; Real Estate and Utility Union Pacific is the largest railroad in North America, covering 23 states across the western two-thirds of the United States . crawford county . 949 4 Sulphur Content ASTM D4294 % Mass 0. 58, Milwaukee Subdivision . 5 Conversion of Private Crossing to Public 4-24 4. ; Drainage and Waterway Hydrology Study Guide; Drainage and Waterway Encroachment Planning Guide & Pipeline Crossing 080808 Folder No. Replanking Projects 1. Skip to Main Content. Home; Real Estate and Utility Specifications; Insurance Requirements. for . Please keep in mind that all sites must be pre-approved by Union Pacific prior to any construction taking place. Last Modified: 06/05/18 . These installations should follow Procedures for Pipeline Crossings or Procedures for Wireline Crossings. Careers. Each crossing location must be filled out separately, Track bores must be a minimum of 60 inches below base of rail. RailPros understands each state’s laws, regulations, and standards. In addition to fulfilling other requirements, fuel oil delivered by pipeline shall be treated with sufficient corrosion inhibitor to produce an NACE rating of B++. 13 MIXED DWARF CLEAR Proceed. The proposed improvements include road widening; sewer and water installation; and upgrading an at-grade railroad crossing. CERTIFICATE OF INSURANCE PRODUCER INSURANCE COMPANY NAME ADDRESS THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND Auto Liability Policy is endorsed to include Union Pacific Railroad as Additional Insured as required by agreement. Home; Real Estate and Utility Pipeline Crossing 080808 Last Modified: 06/05/18 Form Approved, A VPRLaw Folder No 3232-93 PIPELINE CROSSING AGREEMENT Mile Post: 492. Media . 2975-26 . Union Pacific Railroad Pipeline Crossing 080808 . Encroachment. (“ONEOK”) seeks to renew Permit No. Standard Z662-99 Clause 4. 4 Temporary Grade Crossing / Haul-Road Crossing 4-22 4. Salt used in their original format. 42, Ventura (scax) Subdivision . 442 “Damage prevention program” All Company property, permits, pipelines and rights-of-way PHMSA Pipeline and Informed Pipeline Alliance (PIPA) Recommended Practices National Energy Board (NEB) Pipeline Crossing Regulations Part 1 and 2 Appendices Appendix A: Forms and Reports Union Pacific Railroad 12 - 14 Green - Gumwood Crossing Blanks 15 - 18 Green - Oak Rail Crossing Timbers 19 - 21 Green Switch Ties - Oak and Mixed Hardwood 22 - 25 Green Switch Ties - Douglas fir and Western Hem-Fir 26 Glued Laminated Softwood Switchties 27 - 28 Specifications for Glued Laminated Softwood Timbers 29 Green Line Poles - Southern Yellow If your pipeline/wireline installation involves a crossing, please check Pipeline Procedures or Wireline Procedure. Buffalo Pound Non-Potable Water Supply System Regina Bennett Trenchless Engineers performed full design services for this crossing, and six others, including a constructability analysis to determine the preferred trenchless construction method, basis of design report, alignment for the pipelines, cost estimates, schedules, technical specifications, drawing details, settlement calculations and risk evaluation. SCOPE OF STRUCTURES. Pipeline Information and Data includes information specific to each segment number, such as origination and destination locations, approval, authority, size and product codes crossing track fixed object i u p r r m e p o t / / ____ft. Attention! Your ePaper is waiting for publication! By publishing your document, the content will be optimally indexed by Google via AI and sorted into the right category for over 500 million ePaper readers on YUMPU. Union Pacific Railroad Airports. Last Modified: 06/05/18 Form Approved, AVP-Law . 280 South 400 West, Suite 250 . All Class I and some shortline railroad companies operating in Texas require an agreement with contractors to perform work in the railroad's right of way. project as per the Standard Specifications Book. Snow Elementary School Union Pacific Rail Crossing Construction Projects Construction Contact: Peggy Ygbuhay Union Pacific Sr. 00 DEVELOPMENTAL SPECIFICATIONS FOR CONSTRUCTION WORK ON RAILROAD RIGHT-OF-WAY WITH A+B FOR BIDDING RAILROAD FLAGGERS (UNION PACIFIC RAILROAD) Effective Date May 17, 2016 THE STANDARD SPECIFICATIONS, SERIES 2015, ARE AMENDED BY THE FOLLOWING MODIFICATIONS AND ADDITIONS. 6. CRESTON - Union Pacific Railroad has informed the Village of Creston that maintenance work will take place at the railroad crossings on Main Street and Transit Street. ♦ Crossing Surface Details Sewer Main Crossing Notes (Sheet 3 of 3) 14-B Air-Gap Separation 15 Backflow Protection Assembly, RP or DC 15-A Domestic Fire Backflow Assembly 15-B Backflow Assemblies Post Meter 15-S1 Vacuum Breakers 15-S2 Pipe Bedding and Backfill 16 Specifications for: Author: Janet Gonzalez conform to the AREMA specifications, Chapter 5, “Track”, and Union Pacific Standard Drawing 0442C, “Double Shoulder Tie Plate for 6” Base Rail 1:40 Cant”, with punched A-6 square spike holes. Page 3 of 16. C. Generally, agreement processing time will be approximately 30 to 45 days. up. For a full updated copy of the Union Pacific Track Standards, please contact: i. These guidelines are provided as a reference and may not be taken as authority to construct specifications will be considered on a case-by-case basis. Location Pipelines shall, where practicable, be located to cross tracks at approximately right angles Union Pacific is the largest railroad in North America, covering 23 states across the western two-thirds of the United States Crossings not meeting UP design specifications cannot be rushed. DEVELOPMENTAL SPECIFICATIONS . com Shoofly Plan Format Plan &Profile EXXONMOBIL PIPELINE COMPANY v. these are s pecial provisions and they shall prevail over those published in the standard specifications. Anchor: #JUVROEQS; Underpass: New, replaced, modified, or converted. Folder No. These The purpose of this paper is to provide a general overview of the considerations, typical construction methods, and economic implications concerning railroad underground utility These interim guidelines are issued by the Union Pacific Railroad (UPRR) pending completion of the AREMA recommended practice, at which time UPRR will review and Plans shall be drawn to scale showing the relation of the proposed pipeline, angle of crossing, location of valves, railway survey station, right-of-way line and general layout of tracks and The General Conditions and Specifications adopted by the Union Pacific Engineering Department on August 17, 2017 are amended by the following modifications, additions, and deletions. Employees . Utilities will be located so as to provide a safe Encroachment, Underground or Overhead Pipeline / Wireline crossing, etc. edition, including all addenda, specifications, standards, and recommended practices of the documents listed below, except as otherwise indicated: 1. january 18, 2023 . Facilities that involve unit or shuttle train operations may utilize more stringent standards. Trains exceeding 60 MPH proceed prepared to pass the next signal not RailPros coordinates with public agencies that span through Union Pacific Railroad’s (UPRR) 23 state territory to help achieve and implement recommended improvements. THIS AGREEMENT(“Agreement”) is made and entered into as of August 24, 2022, (“Effective Date”) by and between UNION PACIFIC RAILROAD COMPANY, a Delaware Union Pacific is the largest railroad in North America, covering 23 states across the western two-thirds of the United States . ii. These Terms and Conditions set forth general terms applicable to each Supplier’s ♦ Right of Entry Agreement Union Pacific Templates; ♦ Insurance Verification 9. nigro@taylorcommunications. boring and jacking pits when measured at right angles f) distance from Union Pacific is the largest railroad in North America, covering 23 states across the western two-thirds of the United States Union Pacific Engineering Project Specifications. Drainage shall be addressed at all four quadrants of the crossing. Editing, merging or modifying UPRR Specifications is prohibited. Construction and Inspection Processes Pipeline Agreement: Storm water pipelines crossing railroad right of way under the track. Note: parallel pipelines can be included in at grade crossing agreement. Corman Union Pacific Process (1) Complete Application > (2) Application/Review Fee Submission > (3) Engineering Drawings (Including L ocation Map, Plans, & Specifications) Submission > (4) Submission of Liability Insurance Documentation PIPELINE SPECIFICATIONS . For pipelines conveying gas or liquid substances, only steel pipe may be installed under Union Pacific shall determine the crossing surface material type that meets current Union Pacific standards. This application shall only be used for crossing facilities in Minnesota, defined as pipeline or wireline facilities that will cross over or under Union Pacific’s right-of-way from one side to the other in as near a straight line as possible. The pipeline, constructed in 1963consist, s of 8-inch diameter pipeline totaling approximately 134 Union Pacific Corp said on Wednesday that Ferromex (FXE), the Mexican railroad it interchanges with, has resumed issuing permits for grain shuttle trains at the U. Chestnut Street . CA. Suppliers . The term Contractor is defined as any party gaining access to work on Railroad right-of-way or other Railroad operating locations. Notes Union Pacific Railroad Company 2012 Standards Manual . Our Crossing Accident Reduction Education and Safety (UP CARES) program works to reduce train accidents through rail safety education and law enforcement partnerships. 01 Got to meet some fans 😀. 3. MP 193. Sections affected are: These corporate records were pieced together through donations from multiple sources. Pipeline Deliveries. Union Pacific is committed to working with you to develop the most efficient, cost-effective rail plan to meet your Specifications - City of Tulare. Required plans size is 11x17 at 1”=100 or 1”=200’. Railroad reserves the right to change any of the specifications in this document without prior notice. J. Clearances at grade-separated crossings shall be per UP standards, crossing agreements, and any applicable governmental entity requirements. Union Pacific Railroad Safety Rules 3. Temporary lighting may also be required by the Railroad to identify tripping hazards to train crewmen and other Railroad personnel. Reference DOT 49 CFR 195. Location: North Hollywood, Los Angeles County, California • For UPRR, see the Union Pacific Railroad Guidelines for Track & Ground Monitoring. In the absence of a Quiet The grade crossing separation will eliminate delay to over 3,700 vehicles daily, resulting in alleviation of almost 22,500 annual motorist hours of delay. these are special provisionsand they prevail over those published in the standard specifications. Forney, Kaufman County, Texas . 8508 2 API Gravity ASTM D1250 - 34 3 Kinematic Viscosity at 20°C ASTM D445 cst 6. The project will consider eliminating the at-grade crossing at 1st Avenue by two Union Pacific tracks. THESE ARE DEVELOPMENTAL SPECIFICATIONS work on railroad right-of-way (union pacific railroad) polk county . This UNION PACIFIC RAILROAD – SIGNAL RULES 9. 9. Fiberoptics installation under the jurisdiction of the UPRR Information Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. It will also eliminate the potential for collisions between vehicles and trains. com. NSCE-8 11/06/2020 I . Delivery Projects ; Guidelines for Temporary The work to be performed by the consultant consists of providing construction management services for the Barker Road at Union Pacific Crossing Project-Phase 2. Mile Post: 771. Casing pipes larger than 48" diameter or with any portion deeper than 20' shall be submitted to chief engineer of the railroad for approval. 1 There are a number of third party utilities running along and crossing Metrolinx corridors which are not the subject of this document. gov. Please allow sufficient lead time for document handling prior to desired construction date. Design Requirements and Performance Specifications Railroads RFP 18–2 . 1. THESE ARE DEVELOPMENTAL SPECIFICATIONS BNSF Canadian National Canadian Pacific CSX G&W Railroads Kansas City Southern Norfolk Southern R. These standards are developed for fiber optic customer construction and associated work practices. You can also visit the Industrial PIPELINE CROSSING SPECIFICATIONS 1. (402) 501-0340 Upon execution of this Agreement, the Licensee shall pay to the Licensor a one-time License Fee of ninety-six thousand dollars ($96,000. Notify Union Pacific. That Council authorise future Road Pipeline Crossing Agreements to be signed on behalf of the Council by the General Manager and the Application Form be amended as necessary. ♦ Pipeline or Wireline License Request Form; ♦ Right of Entry Agreement Union Pacific Templates; A Quiet Zone refers to a section of a track that contains one or more consecutive public crossings at which locomotive horns are not required to be routinely sounded when trains pass through at-grade crossings. CONSTRUCTION OR MAINTENANCE WORK ON RAILROAD RIGHT-OF-WAY (UNION PACIFIC RAILROAD) Effective Date . To maintain adequate water supply and cutting head reaches the far side of the crossing, it is removed and a reamer is attached to the lead end of the drill string. RRD has coordinated with the Union Pacific Railroad and accepted a modified Right of Entry Agreement. Railroad Crossing Surfaces. 6 Temporary Traffic Control in proximity to Highway-Rail Grade Crossing 4-24 4. Union Pacific Track Standards, latest edition. Construction and Inspection Processes Used when a new overpass removes an existing active at-grade crossing and federal funding is used on the project. The license agreements include a pipeline license agreement with Burlington Northern Santa Fe Railroad and a pipeline crossing agreement with Union Pacific Railroad. The reason for the change is to compensate the Contractor for design and engineering services for revising the Qwest, Level 3 and Sprint packages per Lumen's transmitted diversity specification changes and Union Pacific Railroad (UPRR) request for Submittal 39. See more New Pipeline Installation: Types and Definitions. To begin this process, please contact a member of our Crude by Rail Team. (3) Notwithstanding the definition of "owner" in subsection (2)(l), where there is a requirement for an owner to provide notice to the Director under this Code of Practice, and there is more than one owner of a pipeline crossing Chapter 8: Right of Entry Process Anchor: #i998876 Section 1: Overview Anchor: #i998881 Right of Entry Agreement. 4 Crossing Closures and Consolidation 4-22 4. PIPELINES CARRYING Any proposed pipeline crossings may use the Standard Pipeline Crossings Applications (see information on Pipeline Procedures). Home; Real Estate and Utility Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. 3 "Crossings of Roads and Railways" as follows;. encroachment longitudinal pipe exhibit "a" both encroachment crossing pipeline non-flammable liquid 2) refer to arema volume 1, chapter 1, part 5, section 5. ♦ Background; ♦ Program Authorization and Funding; ♦ Ineligible Crossings; ♦ Replanking Project Agreement Flow Chart 2. Ring engine These documents are provided by Union Pacific to assist 3rd party public projects in the design of track construction plans in accordance with Union Pacific design standards and requirements. American Railway Engineering and Maintenance Association Specifications. 8 MIXED DWARF APPROACH CLEAR SIXTY Proceed. Where necessary on curves, use Curve Block Assemblies in accordance with Union Pacific Railroad Standard Standard Specification of Eastern Siberian Pacific Pipeline Oil (ESPO) https://www. TxDOT Construction Division will obtain the Right of Entry Agreement on behalf of the contractor. Omaha, NE 68179. Casing pipes must extend the full width of the right of way. RoadSafe will temporarily close several locations along the Union Pacific Railroad right-of-way from March 5 to Near Lynwood, just north of I-105 (Century Freeway), Pacific Pipeline splits, with a second leg paralleling the Union Pacific railroad corridor to Chevron's El Segundo refinery. 2. Beautiful cool / sunny weather 😀😀🌞 A maximum rating of 5 is required for acceptance of the fuel oil when tested according to the modified Union Pacific 300°F, 90-minute stability test. December 19, 2023 . CST monitors the insurance limits throughout the project. 70 Oklahoma City Subdivision Location: Oklahoma City, Oklahoma County, Oklahoma THIS AGREEMENT ("Agreement") is made and entered into as of June 8, 2021 ("Effective Date") by and between UNION PACIFIC Where warranted by special local conditions and when mutually agreed to by the railroad company and the owner of the pipeline, accessible emergency shutoff valves shall be installed within effective distances at each side of the crossing. SPECIFICATIONS FOR . The crossing at Main Street will be closed starting at 7 AM on Monday, October 7th, and is expected to reopen at 7 AM on Wednesday, October 9th. as required by Rule 5. Napa County Airport Schools. Union 1. Ali Alavi, Dick Talley, John Worthen, Aaron Eder, Tim Collins and ; Mohammad Moridzadeh; 9–20 . THIS AGREEMENT(“Agreement”) is made and entered into as of , 2016, December 1 (“Effective Date”) by and between , a Delaware UNION PACIFIC If your pipeline/wireline installation involves a crossing, please check Pipeline Procedures or Wireline Procedures. com 1 | P a g e t No. effective date . 150967. THIS AGREEMENT(“Agreement”) Union Pacific Transfers Local Service in Eugene, Oregon, to Genesee & Wyoming’s Central Oregon & Pacific Railroad December 10, 2024 Service; Union Pacific Corporation Declares Fourth Quarter 2024 Dividend November 27, 2024 Financial; Union Pacific Honors 16 Companies with Annual Sustainability Partner Award November 12, 2024 Environment Union Pacific is committed to grow with our existing and new customers in a manner that supports operational fluidity throughout our network. Union Pacific Emergencies 1-888-UPRRCOP (877-7267) Projects Local communities and public agencies developing and working on public projects including public or private crossings, crossing surface utilities (pipeline/wireline) installation, house moves (across our tracks), as well as drainage modifications, environmental access and A conditional or qualified bid will not be accepted if it modifies the Plans or Specifications or method of work. 44, Ayer Subdivision . 5, 2023 5 CSX Corporation 2019 Annual Report 2019 Annual Report In this Report 2 Message from the CEO 4 Delivering Results 5 Safety Focused 6 Raising the Bar on Rail Service 7 Positioned for Growth 8 Environmental, Social and The General Conditions and Specifications adopted by the Union Pacific Engineering Department on September 15, 2023, are amended by the following modifications, additions, and deletions. Test Method Unit Result 1 Density At 15°C ASTM D1298 Kg/L 0. THESE ARE DEVELOPMENTAL The project consists of the approval of two licensing agreements for two pipeline crossings included in the Glen Helen Grade Separation Project (DPW WO#H14057). Dimensions are given in Standard form with metric units in parentheses. L. Public projects may include public or private crossings, crossing surface renewals, road reconstruction at crossings, over- or underpasses, signalized crossing projects, recreational trails, etc. Location: Little Mountain , Weber County, Utah . This chart is only for smooth steel casing pipes with minimum yield strength of 35,000 psi. 1 9. Pipe and wire crossings and encroachments on railroad right-of-way Format; Union Pacific Railroad Pipeline Forms: Union Pacific Railroad Pipeline Forms HTML: Union Pacific Railroad Wireline Forms: Union Pacific Railroad Wireline Forms HTML: Pipeline Cooper E-80 Loading Calculations - Example: Pipeline Cooper E-80 Loading Calculations ♦ Right of Entry Agreement Union Pacific Templates; ♦ Insurance Verification 9. 1) all dimensions measured perpendicular to the centerline of track. Contact Us Settings. 03143-25 . Generally, agreement processing time will be approximately 90 - 120 days. 94, Lakeside Subdivision . Deflection Limits (Table 2), Section 3. Decided: May 13, 2009 In fact, the evidence presented at trial suggests that the portion of the access road crossing Union Pacific's property will be a private crossing, with a locked gate that will only be accessible by ExxonMobil. This is a change to a contract for design services in the Central Valley. Program Overview. FOR . brf-030-2(168)--38-24 . Director, Public Affairs. HLP-1998-0007, issued on December 18, 1998. UNION PACIFIC RAILROAD COMPANY. A portion of this project is within the Union Pacific Railroad (UPRR) right of way. WHEREAS, Union Pacific Railroad Company will issue the City of Mesquite ("City") a license Union Pacific is the largest railroad in North America, covering 23 states across the western two-thirds of the United States . 7 Grade Crossing Maintenance Responsibilities 4-24 Section 5 Grade Separation Projects 5-25 5. THE STANDARD SPECIFICATIONS, SERIES 2015, ARE AMENDED BY THE FOLLOWING MODIFICATIONS AND ADDITIONS. At all other locations on the right -of way the minimum ground cover for uncased steel natural gas pipes must be six (6) feet. Home; Real Estate and Utility Title: 0535A. Drilled crossings 0722A – Specifications for Rail Sections and Rail Drilling 9/11/24 – updated D to 1 1/4” from 1 1/8” for 136 5005A – Wire Bonding Layouts for All Turnouts 0301A – Installation of Road Crossing w/ Prefab Timber Panels 6/4/24 – added new panel design for 110-141lb rail using 8’-6” ties. S. Wet bores are not permitted on Union Pacific property. Utilities shall not be placed within culverts or under railroad bridges, buildings, or other important structures. The ends of steel casings (see Union Files listed in the table below are for the Pacific OCS Region only. For guidelines pertaining to the design of a new Requirements for wireline/pipeline encroachments and crossings (Current Revision) 7 . The agreements are (union pacific railroad) - folder number 3335-29 . Alex Nigro - 402-898-6435 - alex. The permitting process for seismic and vibrosis survey requests, movie productions, and other projects involving temporary use of railroad property is as follows: A non-refundable application fee in the amount of $1045. US 77 La Grange Feasibility Study Virtual Open House Oct. It is the responsibility of the user to obtain the most current This resource, developed by the Union Pacific Railroad Museum, is a comprehensive guide for telling the story of the first American transcontinental railroad. It outlines requirements for pipelines These guidelines are provided by Union Pacific to assist our customers in the design, construction and maintenance of industrial tracks. developmental specifications . 2 (7) regardless of the type of crossing the train is approaching. UNION PACIFIC RAILROAD COMPANY, a Delaware corporation, to be Union Pacific Installations crossing railroad property, to the extent feasible and practical, are to be perpendicular to the railroad alignment and preferably at not less than 45 degrees to the centerline of the track. m. About Us; Contact Us; UP Emergencies: 1-888-877-7267; Customers . construction or maintenance work on railroad right-of-way (union pacific railroad) effective date . Home; Real Estate & Utility UNION PACIFIC RAILROAD 1400 Douglas Street Omaha, Nebraska 68179 UNION PACIFIC RAILROAD INDUSTRIAL TRACK SPECIFICATIONS LAST REVISED: APRIL 12, 2024 PREFACE The following information is provided to help guide you through the planning, design, and construction procedures for developing a rail-served facility. Mile Post: 204. In the present Petition for Renewal , ONEOK North System, L. Location: North Hollywood, Los Angeles County, California If your pipeline/wireline installation involves a crossing, please check Pipeline Procedures or Wireline Procedure. Pipeline installations may be considered encroachments, crossings, or both. Provisions within this Addendum shall supersede those published in the General Conditions and Specifications dated February 21, 2022. This application may not be used for encroachments Adopt a Resolution approving a Pipeline Crossing Agreement and a Wireline Crossing Agreement with the Union Pacific Railroad Company SUMMARY: The City is working on a project to widen Olive Avenue between Gateway Drive and Knox Street. Home; Real Estate and Utility 4. 535 Examples of Pipeline Crossing Agreements in a sentence. 00) to be funded from the Water Capital Improvement Assessment Sewer Main Crossing Notes (Sheet 3 of 3) 14-B Air-Gap Separation 15 Backflow Protection Assembly, RP or DC 15-A Domestic Fire Backflow Assembly 15-B Backflow Assemblies Post Meter 15-S1 Vacuum Breakers 15-S2 Pipe Bedding and Backfill 16 Specifications for: Author: Janet Gonzalez 2023080342 - 2023-08-15 - MND - Pacific Gas and Electric Company L-021A Napa River Pipeline Crossing Replacement Project. Humboldt Bay Municipal Water District Mad River Pipeline Crossing The Pacific Connector Pipeline Project would have consisted of an approximately 229-mile-long natural gas transmission pipeline (crossing through Klamath, Jackson, Douglas, and Coos Counties, Oregon), a new compressor station (the Klamath Compressor), and other associated facilities. Got to see Dan one of my railfanners 😀. Undergroung Wireline Crossing 750 Volts or Less: Application Form Subject: Utility specification form to copy, complete and mail or fax Keywords: wire, wireling, utility, engineering, form, real estate Created Date: 6/17/1998 2:18:44 PM. Emergencies: Mobile Menu. NORFOLK SOUTHERN CORPORATION PROPERTY . encroachment longitudinal pipe exhibit "a" both encroachment crossing pipeline flammable & non-flammable gas (non-liquid) 2) refer to arema volume 1, chapter 1, part 5, section 5. including: the Southern Pacific Transportation Company, the Union Pacific Railroad, The Bancroft Library; University of California, Berkeley, The Railway & Locomotive Historical Society, Pacific Coast Chapter, and people including: John Vios, Erik Pierson, Timothy and Sylvia Wong, Edna NVIRONMENTAL CITY OF PORTLA1'\ID ERVICES 1211 SW Fifth Avenue, Room 800 Portland, Oregon 97204-3713 (503) 823-7740, FAX (503) 823-6995 Dean Marriott, Director RULES FOR SEWER CONNECTION July 1998 Sewer connections must be made in accordance with the Citys Standard Construction Specifications, the City Code, and the following rules. The pipeline is attached to the reamer and the pilot hole is then back reamed while the pipeline is pulled into place. 20, 2022 . Title: Encased Non-Flammable Pipeling Crossing Subject: Utility specification form to copy, complete and mail or fax Keywords: pipe, pipeling, utility, engineering, form, real estate The Public Projects Group is the primary point of contact for local communities and public agencies developing and working on public projects. Tomasz Bodera; 21–30. 7 9. This information will be revised periodically. – STOP 1690. Pipeline Crossing 080808 Folder No. bros-swap-c077(216)--se-77. Contact Persons After Award of the Contract Union Pacific Railroad Company . Phone: 916-789-5957 Email: pygbuhay@up. ): Will any type of equipment be used? If Yes, what type of equipment will be used? How close will the equipment be to the tracks (in feet)? If instructed by the Railroad, have all the on -site personnel completed the Railroad Safety Training? DEVELOPMENTAL SPECIFICATIONS . Encroachments: Encroachment application fee: $4,055. PIPELINE CROSSING AGREEMENT . If a number sign is attached to the crossing sign, it shows the number of crossings for which the whistle signal is required. PIPELINES CARRYING FLAMMABLE SUBSTANCES This includes oil, gas, gasoline, petroleum products or other flammable or highly volatile substance under pressure. MIXED DWARF APPROACH RESTRICTING Proceed prepared to pass next signal at Restricted speed, but not exceeding 15 MPH. Investors . 2008 CA 2347. Encased Non-Flammable Pipeling Crossing Subject: Utility specification form to copy, complete and mail or fax Keywords: pipe, pipeling, utility, engineering, form, real estate Created Date: Your crossing must be tied to one of these objects. The existing pipeline transports hazardous liquids a terminal in the State of Iowato . boring and jacking pits when measured at right PUBLIC HIGHWAY AT-GRADE CROSSING AGREEMENT . Corman Union Pacific Process (1) Complete Application (2) Application/Review Fee Submission (3) Engineering Drawings (Including Location Map, Plans, & Specifications) Submission (4) Submission of Liability Insurance Documentation Handling Party Jones Lang LaSalle Brokerage, Inc. 00 FOR A LICENSE FEE TO UNION PACIFIC RAILROAD COMPANY FOR THE EAST GLEN WATER MAIN EXTENSION PROJECT; AND DECLAlUNG AN EFFECTIVE DATE THEREOF. Union Pacific Railroad Crossing Construction Projects Presentation at San Leandro City Council Meeting . 8 . All work within the UPRR right of way requires Resolution Approving Union Pacific Pipeline Crossing Agreement Touhy Ave Grade Separation Project . 0786258 . ariyancorp. PIPELINE CROSSING . PIPELINE OCCUPANCY OF . A resolution authorizing the City Manager to execute two Pipeline Crossing Agreements with the Union Pacific Railroad Company. The Crossing vs. 1 Overview 5-25 Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. 94, Mineola Subdivision Location: Mesquite, Dallas County, Texas . com, then follow links for “Customers”, “Real Estate”, “Wireline/Pipeline and Fiber Union Pacific cares about the communities we serve and partners with organizations to promote rail safety. Blow the beautiful train horns 😌😌😌😌😌🎺🎺🎺🎺🎺. 2 9. 00). The term Railroad refers to theBurlington Northern & Santa Fe Railway (BNSF) and/or the Union Pacific Railroad (UPRR). QUIET ZONE CROSSING SIGNS These signs are used to warn for crossings where quiet zones are in effect. N0033, Docket No. A crossing is a pipeline or wireline that enters the railroad company's trackage from one side of the right of way to the other side of the right of way in as near a straight line as possible. In the event of conflicts among design requirements, the more restrictive will apply. The unique DOT number for the crossing shall be provided to Union Pacific with any submittal in order to prevent any miscommunication regarding the location of proposed work. To access this manual online visit Telecom/Fiber Optic/SAFT under the About Us section on www. 1 ADMINISTRATIVE PROCEDURES crossing track fixed object i u p r r m e p o t / / ____ft. Union Pacific is the largest railroad in North America, covering 23 states across the western two-thirds of the United States . AGREEMENT . Union Pacific Railroad Engineering Standards 5. pipeline right-of-way (ROW). dgn Author: purdyd Created Date: 5/5/2004 11:54:40 AM DEVELOPMENTAL SPECIFICATIONS . Anchor: #XTQAERRO; Permitted Railroad Crossing: TxDOT projects where the railroad company has Designing for the Future—A Seismically Resilient Transmission Pipeline Crossing in Earthquake Country. 62 – Mineola Subdivision . Union Pacific employees and all other individuals on Company property or involved in Union Pacific business off Company property are prohibited from possessing or hiding weapons in facilities, equipment, or vehicles used in operations while on such property, or on their persons, which includes but is not limited to grips, suitcases, gym bags and purses. Mile Post: 351. Phone: (402) 544-8600 Location of Survey: _____ PERMIT SHALL EXIPIRE 60 DAYS FROM City, State, Lat/Long (provide coordinates in decimal form) THE DATE EXECUTED BY Crossing Closure Projects. Each crossing requires a separate "Exhibit A" and application. Location: North Hollywood, Los Angeles County, California For large and/or shallow pipeline installations monitoring may be required for up to 30 days. McGrath School and Irene M. 18C - 1. THIS AGREEMENT ("Agreement") is made and entered into as of the ____ day of _____, 20____ ("Effective Date"), by and between . Old panel design is still used for 90 pipeline crossing or telecommunication line crossing except where otherwise specified. 8. Definitions used in this document follow in Section 7 – Definitions. Union Pacific Railroad Maintenance of Way Rules 4. 7. 00 *If your application is an encroachment and a crossing, the encroachment fee shall apply. Pipeline Agreement: Storm water SAMPLE ONLY-PIPELINE CROSSING/ENCROACHMENT ISSUE DATE (MM/DD/YY) . nscorp. To purchase a copy of these AREMA guidelines send an Application to AREMA . Our Company Economic Impact Delivering an Excellent Customer Experience Union Pacific Railroad follows AREMA Manual for Railway Engineering Chapter 1 - PART 5 Pipelines. Notify Union Pacific of non-emergency incidents by selecting a topic or concern from this list: Blocked Crossings – Trains stopped blocking a road crossing (if a vehicle is stopped on the railroad tracks, call 888-877-7267 immediately); Community/General Safe Crossing Events – Parades, festivals, races, or other events occurring at or near railroad ♦ Crossing Closure Agreement; ♦ After Project Agreement is Executed; ♦ Exhibit L; ♦ Advanced Funding Agreements 5. For Electrification Requirements, please refer to Electrification Standards, Drawings, and Specifications. the standard specifications, series 2015, are amended by the following modifications and additions. Date”) by and between UNION PACIFIC RAILROAD, a Delaware corporation, (“Licensor”) and Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. 2 Metrolinx shall use right-of-way rail corridor raceways, either running along or crossing the Terms and Conditions. 03 214-39. shall conform to the AREMA specifications, Chapter 5, “Track”, and Union Pacific Standard Drawing 0442D, “Double Shoulder Tie Plate for 6” Base Rail 1:40 Cant”, with punched A-6 square spike holes. The AWMP water main assessment indicated that nearly 90 percent of the neighborhood’s 12 miles of water mains were in need of replacement, including a primary supply main crossing beneath the UPRR tracks. Track bores must be a minimum of 60 inches below base of rail. Uncased UNION PACIFIC RAILROAD. (402) 501-0340 Pipeline Crossing 080808 Project No. Negotiation and Relocation of Utility Pipelines for P3 Projects. Union Pacific Railroad tracks to the south with limited ingress and egress. Excludes rail customer projects except when the 3rd party public project results in modification to a rail customer/industry track. General requirements i. 2. • For BNSF, subject to direction of the BNSF project engineer for the project ii. About Us; Contact Us; UP Emergencies: 1-888-877-7267 ; Customers . The ends of steel casing (see Union Pacific 2. Abstract. Home; Real Estate & Utility Union Pacific. 337 water body crossings; Associated Facilities and road crosses the Colorado River, has an at-grade crossing of the Union Pacific Railroad, and makes several sharp curves over varied terrain south of the city. Form Approved, AVP-Law. DOT 794802S . A casing pipe is required for all pipeline crossings. Location: Des Plaines, Cook County, Illinois . 70 Oklahoma City Subdivision Location: Oklahoma City, Oklahoma County, Oklahoma THIS AGREEMENT ("Agreement") is made and entered into as of June 8, 2021 ("Effective Date") by and between UNION PACIFIC Pipeline Crossing 080808 Last Modified: 06/05/18 Form Approved, A VPRLaw Folder No 3232-93 PIPELINE CROSSING AGREEMENT Mile Post: 492. Fiber Optic Engineering, Construction and Maintenance Standards . Communities . If the installation is an encroachment, please see the A crossing is a pipeline or wireline that enters the railroad company's trackage from one side of the right of way to the other side of the right of way in as near a straight line as possible. Further The Kost Road Improvements at Union Pacific Railroad (UPRR) Crossing Project will be funded with federal funds from the Regional Surface Transportation Program (RSTP), the Walnut Improvements Project will be funded with federal and local funds from the State Transportation Improvements Program and RSTP, and Fourth Street Promenade Extension Project is Jun 01, 2013 The American Railway Engineering and Maintenance-of-Way Association (AREMA) was formed on October 1, 1997, as the result of a merger of three engineering support associations, namely the American Railway Bridge WHEREAS, the project requires the boring of the Union Pacific Railroad Crossing at Shed Road and the entering into a Pipeline Agreement as required by the railroad; and WHEREAS, there is a one-time required license fee of Six thousand and five dollars ($6005. A non-mandatory, but highly recommended, pre-bid meeting will be held to familiarize potential bidders 95501 until 3:00 p. THE STANDARD SPECIFICATIONS, SERIES 2023, ARE AMENDED BY THE FOLLOWING MODIFICATIONS AND ADDITIONS. If there is a valid reason why compliance with the railroad standards is not possible, these reasons must be clearly explained or the application will be rejected and returned to you for further BNSF CN CPKC CSX G&W Railroads Norfolk Southern R. A. Mile Post: 458. Last Modified: 03/29/10 . Form Approved, AVP-Law . One of these agreements is a Right of Entry Agreement. Some services for these projects include a review of traffic plans and interconnection circuits, on-site inspection and audit of preemption and Union Pacific Railroad Company 1400 Douglas St. 3. THESE ARE EXECUTE A PIPELINE CROSSING AGREEMENT AND PAYMENT OF $3,201. . In addition to bringing to life this important achievement in American history, this kit allows students to examine firsthand historical photographs from the Union Pacific collection Union Pacific is the largest railroad in North America, covering 23 states across the western two-thirds of the United States . 5 Amend C. Or, you may use our new online application process. Each supplier (“Supplier”) of materials and/or goods and services to Union Pacific Railroad Company (together with its subsidiaries and affiliates, “UPRR” or "Railroad") is required to accept the following Supplier Terms and Conditions (“Terms and Conditions”). No. Delivery Projects ; Guidelines for Temporary Union Pacific is the largest railroad in North America, covering 23 states across the western two-thirds of the United States . Technical Specifications for Industrial Tracks; Track Design Guidelines for Third Party Public Projects; White Paper - Coordinating with Union Pacific in Alt. The ends of steel casing (see Union Pacific Union Pacific is the largest railroad in North America, covering 23 states across the western two-thirds of the United States . Home. October 17, 2023 . Add new item to Clause 4. june 21, 2022 . 0 GENERAL The application process and guidelines for a pipeline crossing occupancy can be found at www. Union Pacific. Please allow sufficient lead time for document handling prior to UNION PACIFIC RAILROAD INDUSTRIAL TRACK SPECIFICATIONS LAST REVISED: MAY 21, 2021 PREFACE The following information is provided to help guide you through the planning, design, and Union Pacific Public Projects – Geotechnical Requirements Geotechnical Investigation The consultant shall conduct geotechnical exploration, using AREMA guidelines where applicable, for soils testing and analysis and provide recommendations addressing general railroad design issues that include but are not limited to: Existing soil and groundwater conditions to be Union Pacific is the largest railroad in North America, covering 23 states across the western two-thirds of the United States . these are 5. Search; Emergencies: 1-888-877-7267. Where local laws or authorities prescribe a more stringent specification, that specification shall supersede the specification in this manual. These interim guidelines are issued by the Union Pacific Railroad (UPRR) pending completion of the AREMA recommended practice, at which time UPRR will review and determine whether to adopt it. Call Before You Dig: 1-800-336-9193 The document provides interim guidelines for horizontal directional drilling (HDD) under Union Pacific Railroad rights-of-way. notes: _____ and _____. Construction duration is anticipated to be four months. Pacific Time, March 7, 2018, and . Licensee shall, at its own sole cost and expense, procure the following kinds of CP Geotechnical Protocol for Pipeline and Utility Crossing(s) under Railway Tracks Page 1 of 39 GEOTECHNICAL PROTOCOL FOR PIPELINE AND UTILITY CROSSING(S) UNDER RAILWAY TRACKS Engineering Geotechnical and Public Works – Utilities Last Updated: May 16, 2022 2 May 16, 2022 DJW Fig C – Pg 39 & other sections highlighted 1 Feb 25, 2020 Drainage Modification Procedures Detailed instructions - read this first. Home; Real Estate & Utility UNION PACIFIC 2019 Building America Report A report to communities on our social, environmental and economic sustainability progress. Handrails, Technical Specifications for Design and Construction of Track and Other Rail Related Infrastructure These conditions, specifications and guidelines are provided by Union Pacific to assist in the design and construction of track and other rail related infrastructure. Any excavation, holes or trenches on the Railroad property shall be covered, guarded and/or protected. UTA : UTA Standards for Bridge Construction . Where necessary on curves, use Curve Block Assemblies in accordance with Union Pacific Railroad Standard Drawing 262000, “Curve Block Assembly”. 3 Cased Crossings: (h) Casing pipe and joints under railways shall be of leakproof construction capable of withstanding railway loadings specified herein, and shall be of steel unless otherwise indicated herein, or as approved by the Engineer. June 21, 2022 . Wet bores are not permitted on Union Pacific Railroad property. -Mexico border crossing at Real Estate and Utility Specifications; Right of Entry/Temporary Use of Railroad Property; Temporary Use of Railroad Property - Procedures. Specifications for bridge materials shall be per the UP Union Pacific Railroad Crossing Closures GUADALUPE COUNTY, TX – Guadalupe County Road and Bridge Department has been informed of upcoming closures of Union Pacific Railroad crossings for necessary track repairs. 8k, for both track and shoring deflection limits. Location: Cheney, Spokane County, Washington . fzqyrp word afhhxa bwcq twwr fmlisxv icgtqhj envwj yrasmdz bmns